Construction Process of Timber Frame Building

Unlike traditional building methods, timber frame construction is much faster and more efficient. At Ecobels, we guide you through every step of the process—from start to finish—and even handle the complete finishing work. This way, we ensure a smooth and stress-free journey to your dream home.

houtskelet proces
houtskelet proces

TIMBER FRAME BUILDING IN 6 EASY STEPS

1.THOROUGH PREPARATION

5.INTERIOR FINISHING

4.TECHNIQUES

2.IN-HOUSE PRODUCTION

6.FINAL FINISHING

3.ASSEMBLY

A successful build starts with thorough preparation. Gather information about your site (dimensions, regulations, soil analysis) and think about your living needs (layout, style, size).

Already have a design? We’re happy to provide a quote based on your plans. No plan yet? No problem. We connect you with an independent architect who will translate your wishes into a concrete preliminary design. After that, we prepare a clear quote so you know exactly what to expect.

Once approved, we draw up a contract that includes a detailed specification document covering materials, techniques, construction phases, and timelines.

Next, we install your chosen flooring — whether it’s parquet, laminate, or tiles. During plastering, we smooth the walls, neatly finish joints, and add reinforcement corners where needed. Afterwards comes the interior carpentry: stairs, interior doors, and custom woodwork are crafted in our workshop and expertly installed by our skilled craftsmen in your home.

Once the structure is in place, we begin installing the systems. This includes plumbing for electricity, heating, ventilation, and sanitation. Everything is carefully integrated into the construction.

Once approved, we begin producing your home in our workshop. We manufacture the walls and insulate them right away. Roof trusses and floor beams are also prepared using computer-guided precision, including all necessary openings. At the same time, groundwork starts at your building site, ensuring the assembly can proceed immediately without any delays.

The final phase is the technical finishing: switches, sockets, sanitary fixtures, and more. Once these are installed, your home is completely move-in ready.

Ready to live, enjoy, and make memories.

Once the foundation is ready and the building elements are delivered, assembly begins. Within 14 to 18 days, the complete timber frame structure—including windows—is standing. Next, we install the roof and finish the façade. Because timber frame construction is a dry method, there’s no waiting for drying times like with plasterwork. This means we can immediately continue with the interior finishing.

Are you ready to start your project with Ecobels? Contact us today.